Florida · FLHSMV

Installer Field Book

Study aid, not a substitute for the class

Piers, anchors, and the license that lets you set them.

Built from the FLHSMV installer page, Florida Statute 320.8249, Rule Chapter 15C-1, and the department’s installer training manual (revised April 2009). Numbers below are the ones the course drills. If a manufacturer’s manual is stricter, the manual wins. If the rule is stricter, the rule wins. Recheck flrules.org before a job or an exam — chapters get amended.

Pass
70
Bond
$5,000
Liability
$100k
Pier max
8 ft
Frame ties
5 ft 4 in
Clearance
18 in

What to memorize before anything else

July 13, 1994

Before: Type I anchors, 3,150 / 4,725. After: Type II, 4,000 / 6,000. Also the day Zone III counties were split off.

June 15, 1976

HUD labels and data plates begin. Hurricane-resistant homes after this date, with no factory roof ties, do not get over-the-roof ties added.

5 ft 4 in and 2 ft

Diagonal frame ties no farther than 5 ft 4 in. An anchor within 2 ft of each end. Same 2 ft for the first pier and for end centerline ties.

18 in / 12 in

Florida I-beam clearance is 18 inches. On a slope, never under 12. Do not use another state’s 12-inch HUD minimum.

Sources: FLHSMV Mobile Home Installer page and FAQ; §320.8249, Fla. Stat.; Rules 15C-1.0101 through 15C-1.0107 and 15C-2.0073, F.A.C.; FLHSMV Installer Training Manual, rev. 04/09; 24 CFR 3280.305 wind-zone counties. This is a study aid, not a legal opinion and not permission to install without the license, the permit, and listed hardware.